# Is the build slipping? Read the date, not the colour.

Drop the tracker you already keep. Slip check reads plan and actual, applies the three-day rule, projects the finish date and shows which recovery rungs are still open today.

**Drop the build tracker here**

.xlsx, .xls or .csv. Parsed in your browser. Nothing is uploaded.

Choose a file

Try a sample tracker

## Map the columns

Detected from the headers. Change anything that's wrong.

Sheet

Header row

Date

Planned units

Actual units

Units areDetectPer periodCumulative

Pass (optional)

Fail (optional)

Build details and assumptions

Product

BuildEVTDVTPVTMPOther

Target quantity

Gate date

Air freight lead, days

Alternate part qualification, days

Extra shift adds, % capacity

Lead times are defaults. Put in the ones your program uses.

Read the build

Start over

Built against plan, as of last entry

Projected finish at the current run rate

First-pass yield

## Rungs still open today

## The Friday line

One paragraph of status, ready for the thread.

```

```

Copy

### In the build review

- The Friday page as a PDF, every weekBuild review
- Projection history, day over dayBuild review
- The recovery plans with cost, days and riskBuild review
- Every build on the program, and the CM's entryBuild review

Slip check runs entirely in this page. The file is read in your browser and is not sent anywhere. Rules: a slip is actual trailing plan three days running. Gap in days is at the planned rate. Projection is the last seven days of actual output. Rungs close when the days left before the gate are shorter than the lead time to use them.